Proline Prosonic Flow W 400 HART Commissioning
Endress+Hauser 83
10 Commissioning
10.1 Post-mounting and post-connection check
Before commissioning the device:
‣
Make sure that the post-installation and post-connection checks have been performed
successfully.
• Checklist for "Post-mounting" check→ 43
• Checklist for "Post-connection check" → 52
10.2 Switching on the measuring device
‣
Switch on the device upon successful completion of the post-mounting and post-
connection check.
After a successful startup, the local display switches automatically from the startup
display to the operational display.
• If nothing appears on the local display or if a diagnostic message is displayed, refer
to the section on "Diagnostics and troubleshooting" → 128.
• If diagnostic information 104, 105 or 106 appears on the local display, then the
measuring point is not yet correctly mounted/configured → 138.
10.3 Setting the operating language
Factory setting: English or ordered local language
X X X X X X XX X
20.50
Operation
Setup
Main menu
0104-1
Display language
English
Español
Français
Display language
English
Deutsch
Ã
0104-1
Ã
Español
Français
Display language
English
Deutsch
0104-1
Betrieb
Setup
Hauptmenü
Sprache
Deutsch
0104-1
XXXX
1.
2.
3.
4.
A0029420
47 Taking the example of the local display
10.4 Configuring the measuring device
The Setup menu with its guided wizards contains all the parameters needed for standard
operation.