EasyManua.ls Logo

Endress+Hauser Prosonic S FMU90 - 3.4 Mounting the remote display and operating module

Endress+Hauser Prosonic S FMU90
216 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Notes on use
17
1.2 First setup
!
Note!
This chapter describes the commissioning of the Prosonic S via the display and operating module.
Commissioning via ToF Tool, FieldCare or the HART handheld terminal DXR375 is similar. For
further instructions refer to the ToF Tool Operating Instructions, the FieldCare Online Help or the
Operating Instructions supplied with the DXR375.
After switching on the power supply for the first time, the instrument asks for a number of operating
parameters:
!
Note!
By pressing you can return to the previous parameter (e.g. in order to correct the value).
All these parameters can also be changed at a later point of time in the "device properties/operating
parameters" and "device properties/language" parameter sets.
1. Select the display language.
a. Press or to move the marking bar to the
desired language.
b. Press to confirm your selection.
L00-FMU90xxx-07-00-00-yy-027
2. Select the unit for distance measurements.
L00-FMU90xxx-07-00-00-en-028
3. Select the temperature unit.
L00-FMU90xxx-07-00-00-en-029
4. Select the operating mode.
!
Note!
The available options depend on the instrument
version and the installation environment.
L00-FMU90xxx-07-00-00-en-030
5. For level measurements:
Select the control functions, which you are going
to use.
L00-FMU90xxx-07-00-00-en-031

Table of Contents

Other manuals for Endress+Hauser Prosonic S FMU90

Related product manuals