Operating of the Machine
Paraquda Startup & Safety © Essemtec AG
4-5
0000003/11 / November 4, 2014
Initializing
The cover has to be closed before
initializing procedure can be started. All
axes will move to their init position.
rview
The machine initializes. All modules will be
checked and axes move to the init position. The
vacuum sensors are scanned and the friction of
the mechanical guidance is determined (by
measuring the electrical current).
is now ready for production.
Selecting another User ID
After logout follow the login procedure
described above.