EasyManua.ls Logo

FP PostBase Vision - Page 33

FP PostBase Vision
196 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and commissioning
33
Connecting the feeder
Caution! If the feeder was previously in a
cold environment (i.e. below 10 °C / 50 °F):
Wait at least 2 hours after unpacking before
connecting the feeder. The feeder needs this
time to adjust to the environmental conditions.
Connection on the postage meter Connect the feeder connection cable to the
CAN-BUS interface of the postage meter.
Screw the connector on tightly.
Power connection Plug the power cable into the power con-
nection for the feeder.
Only then plug the power cable into the
power socket.

Table of Contents

Other manuals for FP PostBase Vision

Related product manuals