EasyManuals Logo

GE Security EST3 User Manual

GE Security EST3
388 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #222 background imageLoading...
Page #222 background image
Power-up and testing
6.6 EST3 Installation and Service Manual
Initial and reacceptance test procedures
Introduction
Once the system has been wired, programmed, and the circuit
faults corrected, all installed components should be tested as a
system, to insure proper operation.
The initial system check is designed to verify that all
components of the system are installed and operating as
designed. Verifying that the system was designed and installed
according to specifications requires all aspects of the system to
be exercised and the results verified. Where test results differ
from those expected, corrective action must be taken.
Before commencing testing, notify all areas where the alarm
sounds and off-premises locations that receive alarm and trouble
transmissions that testing is in progress.
Records of all testing and maintenance shall be kept on the
protected premises for a period of at least five (5) years.
Required Tools:
Slotted screwdriver, insulated
• Digital multimeter
12inch (30.5 cm) jumper lead with alligator clips
Panel door key
A complete check of installed field wiring and devices should be
made at regular intervals, in accordance with NFPA 72 and ULC
524 requirements. These requirements are covered in the chapter
on preventive maintenance.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Security EST3 and is the answer not in the manual?

GE Security EST3 Specifications

General IconGeneral
BrandGE Security
ModelEST3
CategorySecurity Sensors
LanguageEnglish