EasyManua.ls Logo

GE Security EST3 - Central Station Connection Using Fireworks

GE Security EST3
388 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Listing requirements
C.4 EST3 Installation and Service Manual
• Central Processor Unit (CPU)
• 3-PPS/M Primary Power Supply
• Main LCD Display (LCD)
—or—
KPDISP Keypad Display
• 3-MODCOM Modem Communication Module
—or—
FireWorks
• 3-SAC Security Access Module
• Signature Controller Modules
• Listed bell and bell housing: Ademco model AB12M Bell in
Box
• 24DC12 12 Vdc Voltage Regulator with Security Bell
Interface
• 3-IDC8/4 Traditional Zone I/O Module
• SIGA-MD Motion Detector
• SIGA-SEC2 Security Loop Module
Additional requirements:
• Standby power must provide 24 hours of standby with 15
minutes of alarm
• Maximum entry or exit delay must be 60 seconds
• System must be programmed for a minimum of 15 minutes
bell ring on alarm
• System must be programmed to indicate bell timeout with an
LED
• System power supply, bell power supply (24DC12), and bell
monitoring module (IDC8/4), must all be inside the ATCK
Attack Kit protected cabinet
• Systems using a 3-MODCOM must be configured using two
phone lines with line-cut detection
—or—
a single line with 24-hour test
• System must be programmed to provide closing
confirmation (ring-back) at the arming station
Central station connection using FireWorks
Standard: UL 1610
Minimum hardware:
• 3-RCC7 Remote Closet Cabinet
• ATCK Attack Kit
• 3-TAMPRCC Cabinet Tamper Switch
• Central Processor Unit (CPU)
• 3-PPS/M Primary Power Supply
• Main LCD Display (LCD)

Table of Contents