Power-up and testing
6.12 EST3 Installation and Service Manual
2. Verify the wiring to all Signature devices.
3. Map the SDC circuit by reading the device data; adjusting,
modifying, and accepting devices as required; writing the
information back to the devices; and rereading the device
data.
4. With no map errors displayed, put an input device on the
circuit in the active mode, and verify the appropriate
message is displayed on the LCD module. Put the input
device in the Trouble mode and verify that the correct
Trouble message is displayed.
Note: Individual device testing will be done later.
3-AADC(1) Addressable Analog Driver Controller
module
1. Verify that the module is properly seated in both rail
connectors and secured with the two snap rivets. Verify that
removable terminal strip TB1 is firmly seated.
2. Verify the wiring to all addressable analog devices.
3. Read the addressable analog circuit device data; adjusting,
modifying, and accepting devices as required; writing the
information back to the addressable analog module.
4. With no errors displayed, put an input device on the circuit
in the active mode, and verify the appropriate message is
displayed on the LCD module. Put the input device in the
Trouble mode and verify that the correct Trouble message is
displayed.
Note: Individual device testing will be done later.
3-OPS Off-premises Signaling module
1. Verify that the module is properly seated in both rail
connectors and secured with the two snap rivets. Verify that
removable terminal strip TB1 is firmly seated.
2. Familiarize yourself with the configuration of the module to
be tested.
3. If the module is connected to a municipal box or central
station, advise the appropriate parties that testing is in
progress.
4a. Local Energy Municipal Box (City-Tie) configuration: With
the municipal box connected between TB1-2 and TB1-3,
open the circuit. (Note: You can temporarily substitute a
15Ω, 2W resistor for the municipal box.) Verify that the
module Trouble activates and the appropriate Trouble
message appears in the Trouble message queue. Reconnect

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Security EST3 and is the answer not in the manual?

GE Security EST3 Specifications

General IconGeneral
BrandGE Security
ModelEST3
CategorySecurity Sensors
LanguageEnglish