Power-up and testing
EST3 Installation and Service Manual 6.25
Record of Completion
Protected Property
Name:
Address:
Representative:
Phone:
Authority Having Jurisdiction:
Address:
Phone:
Record of System Installation
This system has been installed in accordance with the NFPA standards listed below, was inspected by __________________
on __________________, and includes the devices listed below, and has been in service since _______________ .
NFPA 72: Year ________; Ch. 1 2 3 4 5 6 7 (circle all that apply)
Manufacturer's Instructions Other (specify):
NFPA 70, , Article 760 National Electrical Code
Record of System Operation
All operational features and functions of this system were tested by __________on _________ and found to be operating properly and in
accordance with the requirements of:
NFPA 72: Year ________; Ch. 1 2 3 4 5 6 7 circle all that apply)
Manufacturer's Instructions
Signed: Dated: Organization:
Other (specify):
NFPA 70, , Article 760 National Electrical Code
System Software
Installed Revision: Checksum:
Revisions & Reasons:
Date of Programmer's Latest Factory Certification:
Programmed by (name):
Data Entry Program Revision Used
System Firmware
Application Programming
Initial Program Installation: Date:
Date:
Date:
Date:
Date:
Maintenance
System deviations from the referenced standards are:
(signed) for Central Station or Alarm Service Company
(signed) for representative of the authority having jurisdiction
(title)
(title)
(date)
(date)
Frequency of routine tests and inspections, if other than in accordance with the referenced NFPA standards:
Page 1 of 2
[EST3ROC1.CDR]