Issue 08/2013 Page 142
MAPLA- Modular energy supply system for load lifting magnets
Repairs/repair
Maintenance work carried out by authorised personnel
Danger
Danger to life!
y
Strong, permanent magnetic elds can impair the operation
of active implants/pacemakers.
Persons with pacemakers are not allowed to remain in the
vicinity of lifting magnets when switched on.
Always maintain asucient safety clearance from the lifting
magnet.
Warning
Risk of injury and risk of damage!
y
During repairs, make sure that the PE/PA connection
(potential connection, usually green/yellow) between
lifting magnet and generator controller is connected to the
electricity supply. Without this, the detection of external ISO
faults in the lifting magnet will not be possible.
y
If this connection is not present, an installed insulation
monitor may no longer be able to detect an insulation fault.
Warning
Risk of injury and risk of damage!
y
When working on the iMAPLA system, insuciently qualied
persons put themselves at risk and can damage the system.
The assembly, connection and commissioning of the
iMAPLA system and work on the electrical systems may only
be carried out by authorised, qualied and specially trained
personnel.
Carry out all connection work according to applicable
national regulations (in Germany: these include VDE
specications).