EasyManua.ls Logo

GTS iMAPLA series - Page 60

GTS iMAPLA series
168 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Issue 08/2013 Page 60
MAPLA- Modular energy supply system for load lifting magnets
Installation and commissioning
General safety instructions
Danger
Danger to life through electric shock
y
All work on the iMAPLA system, visual inspections for
maintenance purposes or cleaning work during operation of
the system can lead to potentially fatal injury through electric
shock.
Switch o the drive unit before all inspection or
maintenance work on the generator or switch box.
Secure the drive unit before being switched on accidentally
(e.g.remove the ignition key and keep it in asafe place).
During operation, never connect or disconnect plug
connections.
Danger
Danger to life!
y
Strong, permanent magnetic elds can impair the operation
of active implants/pacemakers.
Persons with pacemakers are not allowed to remain in the
vicinity of lifting magnets when switched on.
Always maintain asucient safety clearance from the lifting
magnet.
Warning
Risk of injury and risk of damage!
y
When working on the iMAPLA system, insuciently qualied
persons put themselves at risk and can damage the system.
The assembly, connection and commissioning of the
iMAPLA system and work on the electrical systems may only
be carried out by authorised, qualied and specially trained
personnel.
Carry out all connection work according to applicable
national regulations (in Germany: these include VDE
specications).

Table of Contents