OPERATOR'S STATION
Aftertreatment Device Manual Regeneration Request
The aftertreatment device needs regeneration. Usually,
regeneration is performed automatically. However, manual
regeneration is required depending on the conditions. The
marks described below may be indicated on monitor (1).
This mark indicates that the aftertreatment
device manual regeneration is required.
Perform manual regeneration by following the
specified procedure.
(Blinking,
Yellow)
This mark indicates that the aftertreatment
device regeneration is inhibited. Displayed
when the manual regeneration request arises
while aftertreatment device regeneration is
inhibited. Move the machine to a safe place.
Perform manual regeneration following the
specified procedure.
(Lighting,
Yellow)
IMPORTANT:
Manual regeneration performed when the
aftertreatment device regeneration request is
displayed restores aftertreatment device function.
This is not a malfunction.
If the machine is continuously operated despite
the aftertreatment device regeneration request is
displayed, an engine trouble alarm will be displayed.
Consult your authorized dealer.
1
MDC1-01-005

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hitachi ZAXIS 120-6 class and is the answer not in the manual?

Hitachi ZAXIS 120-6 class Specifications

General IconGeneral
BrandHitachi
ModelZAXIS 120-6 class
CategoryExcavators
LanguageEnglish

Related product manuals