12-20
SPECIFICATIONS
Bucket Types and Applications
ZX300LC-6
Bucket
Bucket Capacity
m
3
Application
Front-End Attachment
PCSA
(Heaped)
CECE
(Heaped)
3.11 m
Arm
3.76 m
Arm
Hoe Bucket
1.00
1.10
1.40
1.62
0.90
1.00
1.20
1.40
-
-
Bucket reinforcement can be
welded in four places upon
customer' s request
1.10 1.00
1.40 1.20
Rock Bucket 0.92 0.80
-
Ripper Bucket 0.80
-
One Point Ripper -
-
Clamshell Bucket 0.80
Side ditching
-
f
NOTE:
Symbols in the above table have the following meanings.
: General excavating
: Light duty excavating
: Rock digging
: Loading work
: Slope-finishing work
- : Not applicable (not warrantable)
Hoe bucket is applicable to the following types of work.
General excavating:
For digging and loading operation of sand, gravel, clay, ordinary earth and so on.
Light duty excavating:
For digging and loading operation of dry, loosened earth, sand, mud and so on.
Their bulk density shall be less than 1.60 t/m
3
as a standard.
Loading:
For loading operation of dry, loosened earth and sand.
Their bulk density shall be less than 1.10 t/m
3
as a standard.
Rock digging:
For digging/loading operation of mountain gravels, blasted rock, hard clay, soft rock and so on.
IMPORTANT: Using inapplicable buckets may cause serious damage to the front structure such as boom, arm and
hydraulic cylinders.