9. Install the fan cage.
10. Install the access panel.
11. Do one of the following:
Orient the server back in tower mode.
Install the server into the rack.
12. Connect all peripheral cables to the server.
13. Connect each power cord to the server.
14. Connect each power cord to the power source.
15. Power up the server.
Expansion card replacementExpansion card replacement
SubtopicsSubtopics
Removing and replacing an expansion card from the primary/secondary riser cageRemoving and replacing an expansion card from the primary/secondary riser cage
Removing and replacing an expansion card from the tertiary riserRemoving and replacing an expansion card from the tertiary riser
Removing and replacing an expansion card from the primary/secondary riser cageRemoving and replacing an expansion card from the primary/secondary riser cage
PrerequisitesPrerequisites
Before you perform this procedure, make sure that you have a T-10 Torx screwdriver available.
About this taskAbout this task