EasyManua.ls Logo

HPE ProLiant ML350 Gen11

HPE ProLiant ML350 Gen11
248 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Disconnect all peripheral cables from the server.
5. Do one of the following:
If the server is in tower mode, place the server on a flat, level surface with the access panel facing up .
If the server is in rack mode, remove the server from the rack .
6. Remove the access panel.
7. Remove the fan cage.
8. Disconnect the power and USB cables from the RDX docking station.
9. Remove the RDX docking station:
a. Press and hold the release latch (callout 1).
b. Slide the RDX docking station out of the server (callout 2).
ResultsResults
The installation is complete.
Before installing the replacement RDX docking station in the media bay, install the mounting screws included in the spare kit on the RDX
drive.
Removing and replacing the optical driveRemoving and replacing the optical drive
PrerequisitesPrerequisites
Before you perform this procedure, make sure that you have the following items available:
T-15 Torx screwdriver
Phillips No. 1 screwdriver
About this taskAbout this task
HPE ProLiant ML350 Gen11 Server Maintenance and Service Guide 71

Table of Contents

Other manuals for HPE ProLiant ML350 Gen11

Related product manuals