You have powered o the RH8100 V3. For details, see 6.2 Powering O the
RH8100 V3. Then you have removed all power cables from the server.
You have removed the front I/O module. For details, see 5.6.1 Removing the
Front I/O Module.
You have removed barriers such as the iBBU or supercapacitor support. For
details, see 5.6.7 Removing a Supercapacitor.
Data
You have obtained the cabinet number and chassis number of the RH8100 V3.
You have located the RH8100 V3 based on the preceding information, and
labeled its panel to prevent misoperations.
You have determined the position on the RH8100 V3 for installing a RAID
controller card.
Tools
ESD gloves
Phillips screwdriver (M3)
Packaging materials, for example, an ESD bag
Hardware
A RAID controller card to be installed in the RH8100 V3
Procedure
Step 1 Wear an ESD wrist strap or ESD gloves. For details, see 1 Safety Instructions.
Step 2 Take the spare RAID controller card out of its ESD bag.
Step 3 Align the RAID controller card with the connector on the mainboard and slowly
insert the RAID controller card into the connector. See step (1) in Figure 5-73.
Step 4 Tighten the screws on the RAID controller card. See step (2) in Figure 5-73.
Figure 5-73 Installing a RAID controller card
RH8100 V3 Server
User Guide 5 Removing and Installing Parts of the RH8100 V3
Issue 30 (2019-12-19) Copyright © Huawei Technologies Co., Ltd. 191