EasyManuals Logo

IBM Storwize V5030 User Manual

IBM Storwize V5030
864 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #77 background imageLoading...
Page #77 background image
Chapter 2. Initial configuration 55
Figure 2-20 System Initialization: Restarting Web Server
10.After you complete the initialization process, disconnect the cable between the personal
computer and the technician port as instructed in Figure 2-21. Reestablish the connection
to the customer network and click Next to be redirected to the management address that
you provided to configure the system initially.
Figure 2-21 System initialization: Completion summary
2.10 Initial configuration
This section describes how to complete the initial configuration, including the following tasks:
򐂰 System components verification
򐂰 Email event notifications
򐂰 System name, date, and time settings
򐂰 License functions
򐂰 Initial storage configuration
򐂰 Initial configuration summary

Table of Contents

Other manuals for IBM Storwize V5030

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Storwize V5030 and is the answer not in the manual?

IBM Storwize V5030 Specifications

General IconGeneral
ModelIBM Storwize V5030
CategoryStorage
Controller Enclosures1 or 2
Maximum Drives240
RAID Levels0, 1, 5, 6, 10
VirtualizationYes
Data CompressionYes
Maximum Hosts512
Form Factor2U
Drive TypesSAS, NL-SAS, SSD
Host Interface8 Gb FC, 16 Gb FC, 10 Gb iSCSI, 12 Gb SAS
Processor Cores8 per controller

Related product manuals