EasyManua.ls Logo

Intel FALCON 8+

Intel FALCON 8+
147 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NORMAL PROCEDURES
© 2017 Intel Corporation. All rights reserved. 41
REV 00
APR 2017
4.5.2 Initial Preflight
Aircraft Condition Inspect
Perform a visual inspection of the aircraft. Inspect for:
Central Unit/ Top Canopy No Cracks, Dents, Tears
Propeller attach fittings Fasteners, Hand-tight
Propeller Surfaces Clean; No Cracks, Dents,
Tears
SD Card / USB Stick Present
Camera / Payload Installed
Camera/Payload Lens Cap Removed
Camera Battery Pack (if required) Charged, Connected
Camera / Payload Power On
Propulsion Intel
®
Powerpack™ Battery Charged, Connected
Prior to each mission, charge each Intel
®
Powerpack™ Battery to 100%. Replace battery if
remaining charge is inadequate for planned flight time. Secure battery in aircraft in proper
location with Intel label facing upward.
Intel
®
Falcon™ 8+ UAS Power Switch Press and Hold
Intel
®
Cockpit GCS Antenna Panel Inspect; Fully Extended
Intel
®
Cockpit GCS Harness Installed
Intel
®
Cockpit GCS Battery Level Charged, Connected
Prior to each mission, charge each Intel
®
Powerpack™ Battery to 100%. Replace battery if
remaining charge is inadequate for planned mission time plus 30 minutes. Secure battery in
proper location with Intel label facing downward.
Intel
®
Cockpit GCS Press and Hold
Intel
®
Cockpit GCS Touchscreen Tablet On
Landing Gear Inspect
Flight Area Clear
Propeller Area Clear
Communications Link Established
Warning:
Violation of these safety precautions in the Pre-flight Check
List will result in the loss of the limited warranty included in
the Terms and Conditions of Sale for this product!

Table of Contents

Other manuals for Intel FALCON 8+

Related product manuals