Section 19 Maintenance & Inspection 19-60
After completion of recovery, the following screen is displayed.
2 Turn off the power supply of this equipment by pressing the power button of the
operation unit.
19.11.4 Re-setting C-MAP
Re-set the settings of C-MAP by restarting this equipment.
Re-register the database and the Licence.
Update as required.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the JRC ECDIS and is the answer not in the manual?

JRC ECDIS Specifications

General IconGeneral
Display TypeLCD
Radar OverlayYes
AIS IntegrationYes
Operating Temperature-15°C to +55°C
Chart FormatS-57, S-63
Power Supply24V DC
InterfacesEthernet, USB
ComplianceIMO

Related product manuals