PTX10001-36MR Site Preparaon Checklist
The checklist in Table 21 on page 47 summarizes the tasks you need to perform when preparing a site
for a PTX10001-36MR installaon.
Table 21: Site Preparaon Checklist
Item or Task For More Informaon Performed by Date
Environment
Verify that environmental factors such as
temperature and humidity do not exceed
router tolerances.
"PTX10001-36MR Environmental
Requirements and Specicaons" on
page 49
Power
Measure the distance between external
power sources and the router installaon
site.
Calculate the power consumpon and
requirements.
• Table 12 on page 30
• Table 14 on page 31
Rack or Cabinet
Verify that your rack or cabinet meets the
minimum requirements for the installaon of
the router.
"PTX10001-36MR Rack Requirements"
on page 54
Plan rack or cabinet locaon, including
required space clearances.
"PTX10001-36MR Clearance
Requirements for Airow and Hardware
Maintenance" on page 52
Secure the rack or cabinet to the oor and
building structure.
47