Site Preparation Checklist for the SRX4600 Services
Gateway
Table 17 on page 45 provides a checklist of tasks you need to perform when preparing a site for installing
the SRX4600 Services Gateway.
Table 17: Site Preparation Checklist for SRX4600 Services Gateway Installation
NotesDate
Performed
byAdditional InformationItem or Task
Power
Measure distance between external power
sources and device installation site.
Locate sites for connection of system grounding.
“SRX4600 Services Gateway
AC Power Supply
Specifications” on page 39
“SRX4600 Services Gateway
DC Power Supply
Specifications” on page 41
Calculate the power consumption and
requirements.
Environment
“SRX4600 Services Gateway
Environmental Specifications”
on page 47
Verify that environmental factors such as
temperature and humidity do not exceed services
gateway tolerances.
Rack or Cabinet
“SRX4600 Services Gateway
Rack Requirements” on
page 50
“Cabinet Requirements” on
page 51
Verify that your rack or cabinet meets the
minimum requirements for the installation of the
device.
Plan rack location, including required space
clearances.
45