EasyManua.ls Logo

Juniper SRX4600

Juniper SRX4600
210 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table 32: Parts List for a Fully Configured Services Gateway
QuantityComponent
1Services gateway
2 AC or DCPower supply (preinstalled)
2AC power cord appropriate for your geographical location (only for AC models)
1Rack mount kit
1End User License Agreement
1Documentation Roadmap Card
1Safety Guide
1USB flash drive with Junos OS
1DB-9 to RJ-45 cable
Mounting an SRX4600 Services Gateway on Four
Posts of a Rack or Cabinet
You can mount an SRX4600 services gateway on four posts of a 19-in. rack or cabinet by using the
separately orderable four-post rack-mount kit. The remainder of this topic uses rack to mean rack or cabinet.
Before mounting the services gateway on four posts of a rack:
Verify that the site meets the requirements described in “Site Preparation Checklist for the SRX4600
Services Gateway” on page 45.
Place the rack in its permanent location, allowing adequate clearance for airflow and maintenance, and
secure it to the building structure.
Read “General Safety Guidelines and Warnings” on page 149, with particular attention to “Chassis and
Component Lifting Guidelines” on page 159.
Ensure that you have the following parts and tools available:
67

Table of Contents

Other manuals for Juniper SRX4600

Related product manuals