Table 17: Site Preparation Checklist for SRX4600 Services Gateway Installation (continued)
NotesDate
Performed
byAdditional InformationItem or Task
Secure the rack or cabinet to the floor and
building structure.
Cables
Acquire cables and connectors:
•
Determine the number of cables needed based
on your planned configuration.
•
Review the maximum distance allowed for
each cable. Choose the length of cable based
on the distance between the hardware
components being connected.
Plan the cable routing and management.