D9U001ES2-0101_05
85
Status (Pop-up window)
Meaning How to change the status
Sprint 200 with scales is disconnected
from the mains when operator turns on
the Bed Exit Alarm Monitoring.
Connect Power Supply Cord to
the mains and activate the Bed
Exit Alarm Monitoring.
Battery becomes low (or bad) during
activated Bed Exit Alarm Monitoring.
Connect Power Supply Cord to
the mains.
Bed Exit Alarm Monitoring is activated
and Sprint 200 with scales becomes
disconnected from the mains.
Connect Power Supply Cord to
the mains.
16.8 Pop-up windows connected with Bed Exit Alarm Monitoring