Operating elements for crane operation
9.1 Overview of the operating elements
9 - 8 3 112 xxx en Operating Manual GMK6300L
xx.xx.xxxx
9.1.3 Front panel
1 Emergency stop switch à p. 9 - 65
2 Control unit RCL (Rated-Capacity-Limiter)
à p. 9 - 40
3
Depending on the version:
– RCL override – symbol (A)
or
– RCL override – symbol (A)
– for RCL
– Lifting limit switch
à p. 11 - 44
à p. 11 - 45
4 ECOS control unit
à p. 9 - 20
5 Front control panel
à p. 11 - 8