TMS9000-2 OPERATOR MANUAL SET-UP AND INSTALLATION
6
Published 02-21-2019, Control # 611-05
Positioning/Removing the Hoist Cable
Positioning Hoist Cable
1. Remove the retaining rods (1) (Figure 6-7).
2. Guide the rope over the upper boom nose sheaves (2).
3. Guide the rope over the lower boom nose sheave (3).
4. Reinstall all the retaining rods and secure with retaining
clips.
5. Install the hook tackle or the hookblock. The rope may
now be reeved.
Removing Hoist Cable
1. Unreeve the hookblock.
2. Remove the retaining rods (1) (Figure 6-7).
6.35 1/4 20 15
7.94 5/16 40 30
13.28 3/8 60 45
11.11 7/16 90 65
12.70 1/2 90 65
14.29 9/16 130 95
15.88 5/8 130 95
19.05 3/4 175 130
22.23 7/8 300 225
25.40 1 300 225
28.58 1-1/8 300 225
31.75 1-1/4 490 360
38.68 1-3/8 490 360
38.10 1-1/2 490 360
WIRE ROPE CLIP TORQUE VALUES
Clip Sizes *Torque
mm Inches Nm Ft-Lbs
FIGURE 6-6
Specialty Clip
Specialty Wedge
A
BC
D
EF
CAUTION
Falling Objects Hazard!
Always make sure sheaves and pins that secure the hoist
cable are secured with clips. This prevents components
from coming loose, falling and causing injury.
6769
FIGURE 6-7
2
1
1
3

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove TMS9000-2 Series and is the answer not in the manual?

Manitowoc Grove TMS9000-2 Series Specifications

General IconGeneral
BrandManitowoc
ModelGrove TMS9000-2 Series
CategoryConstruction Equipment
LanguageEnglish

Related product manuals