Innovation. Quality. Performance. Best in Industry. Worldwide.
Routers * Lasers * Plasma * WaterJets * Knife Cutters
www.MultiCam.com
ConnectionManager Setup
1. Open ConnectionManager. 6. Highlight the XMI file for the machine
and select Open.
2. Right-click on No_Connection_Info next to the
machine to be added and select Add.
7. Select Yes at the notice.
3. Highlight either an existing connection if the new
machine is being added to the network or None if
this is a new setup.
8. Refer to the ConnectionManager
dialog and locate the specific machine
connection.
4. Check the box next to Auto Launch
JobNameServer.***
9. Right-click on the connection and
select Report a Problem.
5. Check the box next to Set Preferred Neti using
the Current Neti if the customer wants this
computer to be in charge of all
communications.***
10. Set up the following email settings:
• Email
: email address of the
contact person for the machine
• Server
: mail.multicam.com
• To
: suite4@multicam.com
Mechanical Installation: PHASE III
Option Installation
Fume Extraction – Adjust the air flow.
Bar Code
Run a test file to verify machine operation.