Installation
3-7
P/N 7135268B
E 2008 Nordson Corporation
PURBlue EC
Installing Melter Inputs and Outputs
1. Pass the power cable through the smaller of the two glands (Fig. 3-7) on
the back of the electrical cabinet.
2. Connect the cable as shown in the wiring diagram. The connection
points are located in the left door of the electrical cabinet (Fig. 3-8).
3. When connecting to XT7, observe Information on I/O Expansion Board.
Fig. 3-7 Back of electrical cabinet
−81A1
−XL5
XT7
−XLPE−131K6
−131K7
Fig. 3-8 Connecting points − left door of electrical cabinet