EasyManuals Logo

Nortel SONET AccessNode 800A Series User Manual

Nortel SONET AccessNode 800A Series
450 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #107 background imageLoading...
Page #107 background image
Installing the OSP cables 4-11
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
Procedure 4-2 (continued)
Butting and stripping the VF, miscellaneous, T1 and maintenance cables
Step Action
10 Remove all insulating gel throughout both of the cables with rags and De-gel.
Note:
If using filled cable, remove as much of the gel as you can from the 600
pair cables. A cable that is completely degreased is easier to work with.
11 Cut two inches down at the 8-inch (20.32 cm) mark on the cable towards the
cable conduit parallel to the point where the grounding
shield is folded.
12 Cut one inch to the left, across (perpendicular to) the cable. This creates the
bonding clamp mounting location on the cable.
Note:
Later, a bond clamp is attached to this door or flap in order to ground
both of the cables.
13 Repeat this procedure for each OSP cable (except the fiber cable) pulled into
the cabinet in Procedure 4-1 on page 4-4.
—end—

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Nortel SONET AccessNode 800A Series and is the answer not in the manual?

Nortel SONET AccessNode 800A Series Specifications

General IconGeneral
BrandNortel
ModelSONET AccessNode 800A Series
CategoryNetwork Hardware
LanguageEnglish

Related product manuals