AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
10-1
Adjusting the rectifier and the dc
distribution shelf 10-
This section provides installation procedures for the installation and turn-up of
the modular power rectifier (MPR) 25 rectifiers in the S800A cabinet.
If only one rectifier is installed, perform Procedure 10-1 through
Procedure 10-4 on page 10-16 for rectifier adjustments and perform
Procedure 10-7 on page 10-23 through Procedure 10-10 on page 10-30 for dc
distribution shelf adjustments. If more than one rectifier is installed, perform
all of the procedures in the order presented.
How to use this chapter
In the following table, you will find a list of the procedures adjusting the
rectifiers and dc distribution shelf for the AccessNode S800A Outside Plant
(OSP) cabinet. Perform the procedures in the order listed. If you cannot
successfully complete these procedures, contact your next level of support.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Nortel SONET AccessNode 800A Series and is the answer not in the manual?

Nortel SONET AccessNode 800A Series Specifications

General IconGeneral
BrandNortel
ModelSONET AccessNode 800A Series
CategoryNetwork Hardware
LanguageEnglish

Related product manuals