2-10 Installing the cabinet
AccessNode 323-3001-210 Issue 1.0
Procedure 2-2
Preparing the pad
Use this procedure to prepare the pad for cabinet installation.
Precautions
The following safety precautions should be observed at all times during the
cabinet installation procedures:
Tools and materials required
• one hacksaw or similar cutting tool to cut the cable conduit
• one 2.5-inch (63.5 mm) trade size permanent virtual circuit (PVC) conduit
straight coupling (supplied with the ac power pedestal option)
• one sealant kit supplied with the cabinet
—continued—
CAUTION 1
Potential equipment damage and personal injury
No equipment should be installed until the cabinet is firmly
secured to its mounting pad, as described in this procedure.
CAUTION 2
Potential equipment damage and personal injury
When the cabinet is not secured on the mounting pad, its
stability is greatly reduced. Do not open the front or rear
doors unless the cabinet is firmly secured to the shipping
pallet or the mounting pad.
CAUTION 3
Potential equipment damage
Use special care to prevent damage when handling the
sealant kit material.