AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
1-1
Installing the pad 1-
This
chapter contains procedures for the site preparation and installation of
the AccessNode Series 800A cabinet. The chapter gives information for:
planning site selection and preparation
determining cabinet placement
preparing the cabinet mounting pad
pouring the concrete
How to use this chapter
In the following table, you will find a list of the procedures to install the
concrete pad for the AccessNode S800A Outside Plant cabinet. Perform the
procedures in the order listed. If you cannot successfully complete these
procedures, contact your next level of support.
Chapter task list
This chapter provides the procedures for the tasks presented in the table below.
Task See
Preparing the poured-in-place cabinet mounting pad Procedure 1-1 on page 1-8
Pouring the concrete Procedure 1-2 on page 1-23

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Nortel SONET AccessNode 800A Series and is the answer not in the manual?

Nortel SONET AccessNode 800A Series Specifications

General IconGeneral
BrandNortel
ModelSONET AccessNode 800A Series
CategoryNetwork Hardware
LanguageEnglish

Related product manuals