7-4 Routing and splicing the fiber cable
AccessNode 323-3001-210 Issue 1.0
Cable entry
The S800A cabinet is constructed with cable conduit entry ports located at the
bottom of the end compartments of the cabinet.
Termination compartment
Table 7-1 shows where the fiber cabling has been pulled into the termination
compartment (see Chapter 4, “Installing the OSP cables”) and how much slack
has been pulled for cable routing.
Table 7-1
OSP cable entry locations and lengths
When you pull cable for
Into the termination
compartment
conduit opening at
this location
Then leave this
amount of
cable for
routing
VF cable pairs 1–600 far left 10 ft (3.1 m)
VF cable pairs 601–1200 middle left 12 ft (3.7 m)
VF or miscellaneous pairs middle right 25 ft (7.6 m)
T1 distribution or maintenance pairs middle right 5 ft (1.5 m)
Fiber far right 25 ft (7.6 m)