EasyManua.ls Logo

Nortel SONET AccessNode 800A Series - Procedure 5-1: Routing and terminating OSP T1 and maintenance pairs

Nortel SONET AccessNode 800A Series
450 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Routing and terminating OSP T1 and maintenance pairs 5-3
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
Procedure 5-1
Routing and terminating OSP T1 and maintenance
pairs
This procedure explains how to route and terminate the T1 and maintenance
pairs. See Chapter 13, “Cabinet and equipment wiring and cabling” for
reference information for the service protection center (SPC) signal pair
assignments and specific connector pin designations.
A customer supplied fuse link should be spliced into the T1 and maintenance
pairs outside the cabinet.
Ensure that a QCM2A or equivalent bond clamp(s) is installed on the outside
cable (see Chapter 4, “Installing the OSP cables”).
Material required
A customer supplied outside plant cable hole and conduit plugging compound
are required materials.
—continued—

Table of Contents

Related product manuals