AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
xi
About this document
Scope
This document contains the information required to install and maintain an
AccessNode Series 800A cabinet.
Installation charts contain step-by-step procedures to perform the following:
• mount the cabinet
• install AccessNode equipment
• install peripheral equipment
• wire and cable internal and external terminations
This document aids in the installation and maintenance of the Series 800A
AccessNode cabinet and is intended for the following groups:
• strategic and current planners
• provisioners
• transmission engineers
• network administrators
• outside plant personnel
What this document contains
The document describes the following items:
• mechanical cabinet installation
• general information on the AccessNode equipment
• different installation configurations
• routine preventive maintenance requirements
Procedures are presented in a specific order to ensure that the cabinet and
equipment are installed and maintained properly.