1-4
Installing the pad
AccessNode 323-3001-210 Issue 1.0
Pad installation
Typically, the cabinet is mounted on a poured concrete pad with buried power
and telephone cables passing up through the pad into the bottom of the cabinet
via cabling conduit.
Anchor plate kits
To facilitate placement, optional anchor plate kits are available as shown in
Table 1-3. Each kit consists of an 11-gauge galvanized anchoring template
assembly with anchor bolts and temporary support angles.
Cable entry
The S800A cabinet is constructed with cable conduit entry ports located at the
bottom of the end compartments of the cabinet.
Note: All trade sizes listed are based on Schedule 40 PVC.
Termination compartment
The termination compartment has four 4.50-inch inside diameter (ID)
openings for 4.00-inch trade size conduit, and one 2.00-inch ID opening for
1.50-inch trade size conduit. See Table 1-4 on page 1-5.
Table 1-3
Anchor plate kits and drawings
For this anchor plate kit
assembly
Refer to Drawing number
Load box, wide Figure 1-10 on page 1-18 EV7A52FA
Load box, narrow Figure 1-11 on page 1-19 EV7A52CA
AC pedestal, wide Figure 1-12 on page 1-20 EV7A52GA
AC pedestal, narrow Figure 1-13 on page 1-21 EV7A52DA