AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
6-1
Routing and terminating the VF cables6-
This chapter details voice frequency (VF) cable routing and termination
installation procedures for S800A cabinets equipped with BIX, 710 or MS
2
connectors, with or without cross-connect.
How to use this chapter
In the following table, you will find a list of the procedures to route and
terminate the outside plant T1 and maintenance cable pairs for the S/DMS
AccessNode S800A Outside Plant (OSP) cabinet. Perform the procedures in
the order listed. If you cannot successfully complete these procedures, contact
your next level of support.
Chapter task list
Task See
Connecting the VF cable pairs 601–1200 to BIX
connectors with the cross-connect
Procedure 6-1 on page 6-4
Connecting the VF cable pairs 601–1200 to BIX
connectors with the cross-connect
Procedure 6-2 on page 6-9
Splicing the binder groups using BIX connectors Procedure 6-3 on page 6-14
Connecting the VF cable pairs to BIX connectors
without the cross-connect
Procedure 6-4 on page 6-16
Connecting the VF cable pairs 601–1200 to
710 or MS2 DPM connectors with cross-connect
Procedure 6-5 on page 6-23
Connecting the VF cable pairs 1–600 to
710 or MS2 DPM connectors with cross-connect
Procedure 6-6 on page 6-30
Splicing the binder groups using
710 or MS2 DPM connectors
Procedure 6-7 on page 6-33
Connecting the outside plant cable pairs to
710 or MS2 DMP connectors without cross-connect
Procedure 6-8 on page 6-36