Routing and terminating OSP T1 and maintenance pairs 5-5
AccessNode Series 800A Outside Plant Cabinet Installation 323-3001-210 Issue 1.0
Procedure 5-1 (continued)
Routing and terminating OSP T1 and maintenance pairs
Figure 5-1
Terminate T1 pairs to BIX connectors (with or without the cross connect)
—continued—
Route and tie wrap T1 pairs
under the bottom SPC modules
Completed T1 terminations