11-6 Finishing the S800A cabinet installation procedures
AccessNode 323-3001-210 Issue 1.0
Procedure 11-2
Performing commissioning and site testing
Use this procedure to as a reference to commissioning and site testing
procedures to continue the installation of the S800A cabinet.
Requirements
The S800A cabinet must be operating normally on rectifier power.
Documentation requirements
See Commissioning and Testing, Volume 3.
Action
Step Action
1 Verify that there are no combustible materials in the cabinet.
2 Proceed to the applicable S800A commissioning and testing document as
shown in the following table.
—end—
CAUTION
Fire Hazard
Before closing the cabinet, remove all paper and any other
combustible materials from inside the cabinet after any
maintenance operation is completed.
Failure to comply with this warning could result in a fire.
If you want to Then use this document
Commission
the S800A AccessNode
cabinet system
Commissioning and Testing,
Volume 3
Test
the S800A AccessNode
cabinet system
Commissioning and Testing,
Volume 3

Table of Contents

Related product manuals