30
Executing ON/OFF Control Section 3-6
3-6-2 Setup
To execute ON/OFF control, set the SP, the PID/OnOff parameter, and the
hysteresis.
Setting ch1 to ON/OFF
Control with an SP of
200
°C and Hysteresis of
2
°C
Use host communications or the E5ZN-SDL Setting Display Unit to make the
following settings.
• Set the PID/OnOff parameter for ch1 to “0: ON/OFF”
• Set the SP for ch1 to 200.
• Set the hysteresis for ch1 to 2.0.