EasyManua.ls Logo

ORKEL MP2000-X - 4 Operation

ORKEL MP2000-X
137 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Operation
4.1 Safety 33
4.1.1 Safe work routine 33
4.1.2 Operator safety 33
4.1.3 Other people's safety 33
4.1.4 Assembly on site 33
4.1.5 Elements of hazard during operation 34
4.1.6 Danger zones during operation 34
4.1.7 Risk of overturning 34
4.1.8 Leaving the machine 34
4.2 Connection and setting up the machine 34
4.2.1 Rig up 34
4.2.2 Telescopic drawbar and feed hopper F10 35
4.2.3 Lever/Controls overview 36
4.2.4 Lever list 36
4.2.5 Leveling the machine 37
4.2.6 Placing the tractor with telescopic drawbar 37
4.2.7 Power take off 37
4.2.8 PTO Speed 37
4.2.9 Electrical power source 37
4.2.10 Hydraulic connections 37
4.2.11 Oil temperature 38
4.2.12 Stairs 38
4.3 Daily checklist 38
4.3.1 Daily checklist prior to startup 38
4.3.2 Checkpoints while baling 39
4.4 Break-in period 39
4.4.1 Precautions during the break-in period 39
4.4.2 After the first 50 hours of operation 39
4.5 Automatic operation 40
4.6 Film roller storage 41
4.7 Wrapping arms 42
4.7.1 Wrapping arm emergency stop 42
4.7.2 Installing a new film roller in the wrapper 42
4 OPERATION 32

Table of Contents