EasyManua.ls Logo

RKC INSTRUMENT RB Series - Mounting Procedures (Not Supplied)

RKC INSTRUMENT RB Series
306 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. MOUNTING
IMR02C15-E4
2-7
Mounting procedures (Not supplied)
1. Prepare the panel cutout as specified in 2.2 Dimensions.
(Panel thickness: 1 to 10 mm)
2. Insert the instrument through the panel cutout. (Fig. 2.2)
3. Insert the mounting bracket into the mounting groove of
the instrument. (Fig. 2.3)
4. Push the mounting bracket forward until the bracket is
firmly secured to the panel. (Fig. 2.4)
5. Turn only one full revolution after the screw touches the
panel. (Fig. 2.5)
6. The other mounting bracket should be installed the same way described in 3 to 5.
Fig. 2.1
Panel
Mounting
holes
Fig. 2.5
Fig. 2.3
Fig. 2.4
Panel
Fig. 2.2

Table of Contents

Other manuals for RKC INSTRUMENT RB Series

Related product manuals