Roche Diagnostics
B-30 Operator’s Manual · Version 1.0
4 Cassette URISYS 2400
First-time installation
First-time installation
Unpack and install the cassette
The cassette is delivered in an airtight polyethylene-coated aluminum bag,
which is tightly placed in an outer package box. This secure packaging ensures
the shelf life of the cassette in the unopened package as printed on the package
box.
The test strips are stable within the tightly closed cassette compartment for
fourteen days. After this time, the cassette must be replaced by a new one.
Carefully unpack the URISYS 2400 cassette to prevent damage to the test
strips. Use the [Change Cassette] screen in the Maintenance menu to install
the cassette for the first time. The instrument must be in Standby.
a To unpack and install the cassette for the first time
1 Press <Menu> on the [Routine Monitor] screen. The [Menu] screen is
displayed.
2 Press <Maintenance>. The [Maintenance] screen is displayed.
3 Press <Change Cassette>. The [Change Cassette] screen is displayed.
4 Press <Remove> to set the cassette holder mechanism to the exchange
position.
5 A confirmation window “Press <Execute> to start change cassette”
appears.
6 Press <Execute>. A window “Do not open the door” appears, followed by
“Exchange Cassette, then press <Yes> key”.
7 Open the URISYS 2400 package, unfold the aluminum bag and cut it open
with scissors.
8 Remove the cassette from the packaging as shown below and remove the
two protection pads.
When the aluminum bag is opened, the cassette must be placed into the cassette
compartment of the instrument and the compartment door firmly closed within
three minutes to prevent damage of the test strips by humidity or nitrous gases in
the air.