EasyManuals Logo

Sea-doo SP User Manual

Sea-doo SP
372 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #252 background imageLoading...
Page #252 background image
Section 08 PROPULSION SYSTEM
Sub-Section 05 (VARIABLE TRIM SYSTEM)
08-05-5
ASSEMBLY
Assembly is essentially the reverse of disassem-
bly procedures. However pay particular attention
to the following.
8,9,10, Motor, Worm and Sliding Shaft
Apply synthetic grease to worm.
Screw worm to sliding shaft.
Mesh worm splines to gear of motor.
1. Mesh worm spline to gear of motor
Install motor, worm and sliding shaft in VTS hous-
ing.
Tighten nuts
no. 11
of motor to 7 N•m (62 Ibf•
in
).
Connect wires of motor.
Install cover
no. 7
.
NOTE:
Make sure seal
no. 12
is in place.
INSTALLATION
Installation is essentially the reverse of removal
procedures. However pay particular attention to
the following.
4,5, Nut and Seal
Place seal on nut. Make sure seal lips are facing
toward hull.
1. Seal lips facing hull
2. Nut
Install nut with seal and torque to 13 N•m (10
Ibf•ft) using the VTS socket tool.
1, Ball Joint
SPX and XP Models
Install ball joint on RIGHT side of sliding shaft.
Torque fasteners to 10 N•m (88 lbf•
in
).
NOTE:
Install boot on sliding shaft before secur-
ing ball joint.
GSI and GSX Models
Install ball joint on LEFT side of sliding shaft.
Torque fasteners to 10 N•m (88 lbf•
in
).
NOTE:
Install boot on sliding shaft before secur-
ing ball joint.
-
CAUTION
Make sure wire color codes match.
F01J2PA
1
F01J2GA
F01J2LA
1
2
www.SeaDooManuals.net

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sea-doo SP and is the answer not in the manual?

Sea-doo SP Specifications

General IconGeneral
BrandSea-doo
ModelSP
CategoryBoat
LanguageEnglish

Related product manuals