EasyManua.ls Logo

Sea-doo SP - Steering Alignment

Sea-doo SP
372 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 09 STEERING SYSTEM
Sub-Section 02 (SP AND SPX MODELS)
09-02-5
Torque bolts of steering stem arm
no. 10
to
6 N•m (53 lbf•
in
).
1. Steering stem
2. Steering stem arm
3. Support
4. Torque to 6 N•m (53 lbf•in)
5. Integrated flat key must be seated in keyway and steering stem
arm locked in place
NOTE:
Once steering stem arm is properly tight-
ened, look between body and front support to
make sure there is no gap between steering stem
arm and its support. If there is a gap, components
are not properly installed.
Connect wiring harnesses.
Route throttle cable alongside bilge. Insert cable
barrel into carburetor throttle lever.
Insert throttle cable alongside choke cable in tie-
blocks.
For throttle cable adjustment, refer to FUEL SYS-
TEM 05-04.
18, Ball Joint
Secure steering cable ball joint to nozzle as per
following illustrations.
SP MODEL
1. One washer each side of arm
2. Torque nut to 2 N•m (18 lbf•in)
SPX MODEL
1. Ball joint on top of arm
2. Torque nut to 7 N•m (62 lbf•in)
STEERING ALIGNMENT
For steering alignment, refer to STEERING SYS-
TEM 09-06.
-
CAUTION
Ensure the ball joint is parallel (± 5°) to the
nozzle arm.
F01K1NA
1
3
2
5
4
F01K1OA
1
2
F06K01A
1
2
www.SeaDooManuals.net

Table of Contents