EasyManuals Logo

Shinko PCB1 User Manual

Shinko PCB1
160 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #89 background imageLoading...
Page #89 background image
- 89 -
[Power Restore Action]
If power fails during program control, the controller can be operated depending on the selection
in [Power restore action].
Progressing time error when power is restored: 1 minute or 1 second
Stops after power is restored:
After power is restored, stops current program control, and returns to Program control STOP
(in Standby) status.
Continues after power is restored:
After power is restored, continues (resumes) program control.
Suspends after power is restored:
After power is restored, suspends (on hold) current program, and performs Fixed value
control using the step SV from the point of suspension.
Pressing the RUN key cancels suspension, and program control resumes.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Shinko PCB1 and is the answer not in the manual?

Shinko PCB1 Specifications

General IconGeneral
BrandShinko
ModelPCB1
CategoryController
LanguageEnglish

Related product manuals