Chapter 9 Operating Instructions
M4000 Adv., Adv. A/P, Area
100 © SICK AG • Industrial Safety Systems • Germany • All rights reserved 8010797/YT72/2016-02-19
Subject to change without notice
Commissioning
9.3 Test notes
C
heck the protective device as described below and in accordance with the applicable
standards and regulations.
These tests are also used to identify if the protection is affected by external light sources
or other unusual ambient effects.
These tests must therefore always be performed.
9.3.1 Pre-commissioning test notes
WARNING
Ensure that you do not place anybody at risk during initial commissioning of the
machine!
Always expect that the machine, plant or the protective device does not yet behave as you
have planned.
Ensure that there are no persons in the hazardous area during initial commissioning.
Check the effectiveness of the protective device mounted to the machine, using all
selectable operating modes as specified in the checklist in the annex (see 15.2 on
page 142).
Ensure that the operating personnel of the machine protected by the multiple light
beam safety device are correctly instructed by qualified safety personnel before being
allowed to operate the machine. Instructing the operating personnel is the responsibility
of the machine owner.
Annex 15.2 of this document shows a checklist for review by the manufacturer and
OEM. Use this checklist as a reference before commissioning the system for the first
time.
9.3.2 Regular inspection of the protective device by qualified safety personnel
Check the system following the inspection intervals specified in the national rules and
regulations. This procedure ensures that any changes on the machine or manipulations
of the protective device after the first commissioning are detected.
If major changes have been made to the machine or the protective device, or if the
multiple light beam safety device has been modified or repaired, check the plant again
as per the checklist in the annex.