EasyManua.ls Logo

SICK VMS6200

SICK VMS6200
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 MAINTENANCE AND REPAIR
58
8025140/2020-02-03|SICK
TRANSLATION OF THE ORIGINAL OPERATING INSTRUCTIONS| VMS6200
Subject to change without notice
7.1 Monitoring and cleaning work
7.1.1 Control measurements
Ensure proper functioning of the VMS6200 by means of regular controls.
To do so, check the measurement accuracy of the volume measurement system using
defined test objects.
If any unexpected deviations are found, check the volume measurement system for
mechanical damage.
Should the volume measurement system show signs of mechanical damage, contact
SICK Service.
Place the reference object in a centered position on a conveyor element.
NOTE! The volume measurement systems need to be able to detect the entire
reference object when it passes the laser line.
Make sure that the reference object does not change its spatial position when passing
the laser line.
7.1.2 Visual control
Regularly check the conveying equipment for damage or contamination.
Replace any damaged belt elements immediately.
Check the electrical installation regularly.
Make sure that all cable connections are secure.
Replace any damaged connecting cables immediately.
Operational check
of the volume
measurement
Visual inspection of the
conveying equipment
Visual inspection of
the cables

Table of Contents

Related product manuals