Connection
4.5 Connecting the interface module to a CM IM DP Direct connection module
ET 200pro distributed I/O system
82 Operating Instructions, 03/2013, A5E00335544-08
Opening and preparing the connection module
1. Remove the two screws from the bottom of the connection module using a crosstip
screwdriver.
2. Remove the cover from the connection module.
3. Install M20 screwed cable glands at the cable inlets using an open-end wrench. The blind
plates will break off automatically when you screw in the glands. Tighten the cable glands
on the connection module (torque = 3 Nm).
4. Feed the PROFIBUS Hybrid cable through the bottom cable gland in order to achieve a
maximum possible bending radius.
Stripping PROFIBUS Hybrid cables
1. Strip the PROFIBUS Hybrid over a length of 97 mm.
2. Remove the white filler material, and the two black fillers of the 4-wire PROFIBUS Hybrid
cable.
3. Slide the shielding braid back towards the sheath by approx. 15
+/-2
mm.
4. Carefully strip off the shielding film and the two white fillers from the PROFIBUS DP
cable.
Figure 4-8 Stripping dimensions for PROFIBUS Hybrid cables

Table of Contents