EasyManua.ls Logo

Siemens ET 200pro - Page 92

Siemens ET 200pro
545 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Connection
4.7 Connecting the Interface Module to the CM IM DP M12, 7/8" Connection Module
ET 200pro distributed I/O system
92 Operating Instructions, 03/2013, A5E00335544-08
Required accessories
Preassembled cable with M12 and 7/8" cable connectors The cables are available in
different lengths.
If you are fabricating your own cables:
M12: 2-core, shielded bus cable, and b-coded M12 cable connectors
7/8": 5-core cable and 7/8" cable connector
Pin assignment of the M12 and 7/8" cable connectors
View of the M12 and 7/8" cable connectors
Terminal
Assignment
M12 cable connector, b-coded, for feeding
DP1 X03
1
Supply positive (P5V2)*
2
Data line A
3
Data reference potential (M5V2)*
4
Data line B
5
Functional earth
Thread
Functional earth **
M12 cable connector, b-coded, for forwarding
DP2 X04
1
Supply positive (P5V2)*
2
Data line A
3
Data reference potential (M5V2)*
4
Data line B
5
Functional earth
Thread
Functional earth **
7/8" cable connector for feeding X01
1 Ground for load voltage supply
2M
2 Ground for electronics/
encoder supply 1M
3
Functional earth
4
1L+ electronics/encoder supply
5
2L+ load voltage supply
7/8" cable connector for looping X02
1 Ground for load voltage supply
2M
2 Ground for electronics/
encoder supply 1M
3
Functional earth
4
1L+ electronics/encoder supply
5
2L+ load voltage supply

Table of Contents

Related product manuals