EasyManua.ls Logo

Smartrise F220

Default Icon
279 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
MAIN POWER SETUP
Main Disconnect
Verify that main disconnect is turned off prior to installing wiring on
controller
Push Button Breakers
Verify that all green push button breakers are in the up position (OFF).
Do this for all 120vac, 240vac and 24vdc breakers.
Controller Main L1/L2 Breaker
Verify that the L1/L2 breaker is in the OFF position (green shows in
windows)
Green in Window
OFF
Red in Window
ON
Up = OFF
White showing
Down = ON
NO White
showing

Table of Contents

Related product manuals